Robotic UHP hydroblasting · UAE & GCC

We take hulls & tanks back to steel. Robotically.

Our magnetic crawler robots deliver powerful UHP water jetting to remove coatings, corrosion and marine growth — achieving WJ-2 surface preparation with precision and efficiency.

We operate it. We trust it. We supply it.

Robotic hull hydroblasting · Abu Dhabi, UAE · Oct 2026

2,800bar
UHP jet pressure
9robots
Hydro · sand · paint
25–50m²/h
Per robot, by pump size
24/7
Day + night shifts
Stern before hydroblasting Same stern after robotic hydroblasting
BEFOREAFTER · WJ-2
Drag the slider

Same stern, one day of robots

Vessel stern counter, Abu Dhabi. Left: old antifouling as docked. Right: the same view after robotic hydroblasting to WJ-2 — clean grey steel, ready for inspection.

Plan your job

How long will it take?

Enter your area and see the estimated robot time at WJ-2. We confirm every figure with a method statement and schedule.

—Robot hours
—Days, 2 shifts (20 h)
—Manual-lance days, same area

Estimate at WJ-2 on normal coating. Thick antifouling or heavy pitting runs slower. Manual comparison: 2 guns per pump, ≈ 75 m² per gun per 12-h shift.

Follow our work

Live from the dock

Site photos, night shifts and before-and-after shots from our current jobs.